MyAssignmenthelp

Get Help From World's No.1 Online Tutoring Company

Get Online Tutoring through WhatsApp

Question & Answers

PPMP 20010 Assessment 1 Part 1 Project status report

Assessment 1 - Outline

  • Individual assignment
  • Due Date: Monday, Week 7 (11:45pm AEST)
  • Case Study for Assessment 1 & 2
  • Assessment 1 (Part 1 & 2) templates provided
  • Must be completed using the templates ONLY
  • Submission format:
    • MS Word, checked by Turnitin software

Assessment 1 –

Alignment to Unit Learning Outcomes

  • Learning Outcome 3 (from Unit Profile)
  • Define and justify project event-driven and time-driven

controls for a case study project.

Case Study (Project)

  • The real-life case study is Queensland health payroll system
  • Download the case study from the Assessment block in
  • You need to complete Assessment 1 Part 2 and Assessment 2 in the context of the case
  • A number of URLs containing the information are provided in the case study
  • This information is not You need to widen your research until an in-depth understanding of this project is reached.

Assessment 1 Part 1 –

Project status report

  • Assessment 1 Part 1 is about the project status (progress) at a given point of time during the execution phase.
  • Project status report is a tool used throughout the life of a project to provide information on how the project is proceeding and progressing.
  • This report is a vital communication tool aimed at the sponsor, project board and/or steering committee.
  • Download the Assessment 1 Part 1 template from the Assessment block in Moodle.

Project Status Report

  • Project status report usually contains the following sections:

– Gantt Chart

– Performance (Variance) Analysis

– Estimated Cost At Completion (EAC)

– Cost Summary

– Forecast Completion Date

– To-Complete Performance Index (TCPI)

– Milestones status

– Exceptions

Gantt Chart

  • Gantt Chart invented by Henry Gantt in
  • It illustrates the project
  • It illustrates the start and finish dates of the project tasks/activities.
  • It also shows sequence of
  • Tasks constitute the work breakdown structure (WBS) of the

Gantt Chart - Example

Performance (Variance) Analysis

  • Performance analysis is used to check the progress (status) of the project during the execution
  • Status of every task, sub-task, summary tasks and the project is measured at regular intervals of

•        CPI% = (EV/AC) * 100

  • CPI% < 100% - actual cost is above the planned cost
  • CPI% = 100% - actual cost is the same as planned cost
  • CPI% > 100% - actual cost is below the planned cost

•        SPI% = (EV/PV) * 100

  • SPI% < 100% - less work completed than planned
  • SPI% = 100% - work completed as planned schedule
  • SPI% > 100% - more work completed than planned

Estimated cost At Completion (EAC)

  • EAC is the forecasted cost of the project at completion, as the

project progresses ...

  • BAC Budget At Completion = Total PV (Total planned budget of the

project)

  • Use appropriate EAC method based on the following assumptions:
    • Method 1: based on actual cost to date, and predicts future work

will be accomplished at the budgeted rate

  • EAC = AC + (BAC – EV)
  • Method 2: assumes what the project has experienced to date is expected to continue
    • EAC = BAC / CPI
  • Method 3: based on both CPI and SPI factors, when project schedule is impacting the estimated cost to complete the project
    • EAC = AC + [ (BAC - EV) / (CPI x SPI) ]

To-Completion Performance Index (TCPI)

  • TCPI is a measure of cost performance that is required to be achieved with the remaining resources in order to meet specified management
  • TCPI is expressed as a ratio of the cost to finish outstanding work to the remaining
  • TCPI = Work Remaining / Funds Remaining
  • Use appropriate TCPI formula based on the following assumptions:
    • Assumption - BAC is still valid:

TCPI = (BAC-EV) / (BAC-AC)

  • Assumption - BAC is not valid anymore:

TCPI = (BAC-EV) / (EAC-AC)

Forecast Completion Date

  • Forecast completion date forecasts the end date of the project, as the project progresses ...
  • It is derived from the Schedule Performance Index (SPI)

•        Forecast completion date

Total duration of the project / SPI        (e.g. 60 months / 0.92)

  • If SPI < 1, then project is expected to be completed after the scheduled completion
  • If SPI = 1, then project is expected to be completed as per the scheduled completion date.
  • If SPI > 1, then project is expected to be completed before the scheduled completion date

Milestones status

  • Milestone is an event on a schedule, which marks the completion of a key
  • Progress on the milestones is provided in this
  • Any issues with the milestones are also listed in this

Assessment 1 - Part 1

Project status report template

  • Gantt chart is provided to you in the
  • PV, EV & AC data is also provided to you within the
  • You are required to analyse the project progress in terms of the main tasks and data provided in the
  • You don’t need to refer to the case study for this report as data provided is

Expert's Answer

For Viewing Complete Solution

Chat with our Experts

Want to contact us directly? No Problem. We are always here for you

Professional

Online Tutoring Services

17,148

Orders Delivered

4.9/5

5 Star Rating

748

PhD Experts

 

Amazing Features

Plagiarism Free

Top Quality

Best Price

On-Time Delivery

100% Money Back

24 x 7 Support

Ask a New Question
*
*
*
*
*

TOP

  Connect on WHATSAPP: +61-416-195006, Uninterrupted Access 24x7, 100% Confidential

X